Tuesday, December 18, 2007

12 - More Practice

I'm still working on the practice scenery kit. With it being so close to Christmas I'm having a hard time finding the time to work on the practice kit or the layout. The last time we saw the practice kit it looked like this.

I have to apologize dear reader, I've failed to document some steps. More than a few I'm afraid. I let the plaster cloth dry for a few days and then painted assembled and installed the culvert in the lower left section. Then the rock castings were installed and painted. Once the paint dried I "fly specked" the rock faces with a little Woodland Scenic "fine soil". I let that dry and then installed the track roadbed and then the track. After the glue dried I ballasted the track and gave the whole thing a coat of WS "Earth Undercoat".

That leads us to the next couple of pictures. Once the paint had dried then I started "planting" ground cover. This is just the first dusting. After this layer dries then there are 3 or 4 more shades that I'll salt 'n pepper on.



The above photo shows the culvert and the rocks. The lower left where the culvert is has had one dusting of WS "blended green turf" applied.

Now I have the the culvert and rocks masked so I could break out the "scenic sprayer" and give the rest of the diorama a dusting of blended turf. After the scenic cement, which is really just watered down white glue applied with a sprayer, dries then I can continue adding some more turf colors, some under brush and a couple trees.

As for the big layout. I haven't been able to get too much done. I did get plaster cloth laid on the portion of the risers that will be inside the tunnels. After that set up I got the track reassembled and the plaster sanded and evened out. Now it's time to lay roadbed and track that will be inside the tunnels and then actually build the tunnels. It will be after Christmas before that gets done though.

Last weekend I got my first boxcar kit. A 40 foot Burlington Northern boxcar. I even upgraded the trucks and couplers...the ones that come with the kits are garbage, i.e. plastic. Even after buying the extra couplers and trucks the cost of the kit is about 50% less they buying the ready to roll one. It only took my about 15 mins to put it together. I think if I can find a kit version of a car I want I'll go that route...way cheaper!!!!

No comments: